Documentation and Compliance
TERRA specializes in comprehensive environmental compliance for complex infrastructure projects, delivering integrated LSP services that ensure regulatory adherence while maintaining project schedules and budgets
Scope of Work
MassDOT Environmental Specification Compliance
Section 180.1: Environmental Compliance oversight
Section 180.2: Water Pollution Control protocols
Section 180.3: Air Pollution Control measures
Section 180.5: Solid and Hazardous Waste Management
Section 180.6: Contaminated Soil and Groundwater handling
Sections 181.11-181.14: Specific remediation protocols
Section 756: Specialized environmental requirements
Licensed Site Professional Services and MCP Compliance (310 CMR 40.0000)
LSP oversight throughout all project phases
Massachusetts Contingency Plan regulatory compliance
Remedial Action Plan development and implementation
Release Tracking Number management
Professional opinions and regulatory submittals
Coordination with MassDEP for approvals
Comprehensive Soil Management and Disposal Operations
Systematic soil screening and field assessment
Laboratory sampling and analysis for contamination characterization
Contaminated soil handling and segregation protocols
Onsite treatment evaluation and coordination
Offsite disposal at licensed facilities
Chain-of-custody documentation and manifesting
Waste classification and disposal facility approvals
Health and Safety Monitoring and Worker Protection
Site-Specific Health and Safety Plan development
Continuous field oversight during all activities
Air monitoring and dust control measures
Personal protective equipment protocols
Worker training and compliance verification
Public protection measures during construction
Comprehensive documentation and reporting
Chelsea Viaduct Environmental Consulting
TERRA is providing full-service environmental management, transportation, and disposal services for a Massachusetts Department of Transportation (MassDOT) infrastructure project. Working under the general contractor's agreement, our team delivered integrated environmental solutions encompassing health and safety oversight, Licensed Site Professional (LSP) services, and complete environmental project management from planning through execution.
Project Scope and Management: The project required managing all technical, operational, and staffing aspects of environmental work, including development of comprehensive project plans and preparation of regulatory submittals for agency approval. Our team provided complete oversight and execution of fieldwork activities while ensuring continuous compliance with state and federal environmental regulations. The work encompassed both pre-construction environmental assessment and active construction-phase environmental management.
Health and Safety and LSP Services: Central to the project was providing Licensed Site Professional services to ensure Massachusetts Contingency Plan (MCP) compliance throughout all phases of work. This included development and implementation of Remedial Action Plans specific to identified contamination conditions. Continuous health and safety monitoring was maintained during all field activities, with comprehensive documentation and reporting to protect workers and the public while meeting regulatory requirements.
Soil Management and Analysis: Field activities included systematic soil screening, sampling, and laboratory analysis to characterize contamination conditions and guide remedial actions. Our team managed all aspects of contaminated soil handling, from initial identification through final disposition. This involved coordinating both onsite treatment options and offsite disposal at appropriately licensed facilities, ensuring full chain-of-custody documentation and regulatory compliance for all contaminated materials.
Regulatory Compliance Framework: All work was conducted in strict accordance with MassDOT's comprehensive environmental specifications, including sections 180.1 (Environmental Compliance), 180.2 (Water Pollution Control), 180.3 (Air Pollution Control), 180.5 (Solid and Hazardous Waste Management), 180.6 (Contaminated Soil and Groundwater), sections 181.11 through 181.14 covering specific remediation protocols, and section 756 addressing specialized environmental requirements. This regulatory framework ensured consistent environmental protection standards while facilitating efficient project delivery within MassDOT's established environmental management protocols.

Jesse Vaughan
Project Team

Curtis Melo

Chelsea Viaduct Project
Project Highlights
Environmental consulting and transportation/disposal services for MassDOT projects
Licensed Site Professional (LSP) services and Massachusetts Contingency Plan (MCP) compliance
Health and safety monitoring with soil screening, sampling, and analysis
Contaminated soil management including onsite treatment and offsite disposal coordination
Regulatory compliance and documentation per MassDOT specifications 180.1-180.6 and 181.11-181.14